CAR-SR 542-12.62
CAR County · est $0.7M
Bid dateThursday, November 19—
CAR County · est $0.7M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 62 more items below.
| Item | Quantity | R1Buds INC | R2Shook Company LLC | R3Mc Connell Contracting INC | R4Black Horse Bridge Construction INC | R5Bog Construction INC | R6Rietschlin Construction INC | R7Alan Stone CO INC | R8Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 515E12031 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 8 EACH | $12,000 | $8,900 | $11,000 | $10,000 | $11,500 | $9,000 | $11,000 | $9,050 | 21% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 100 CY | $450 | $460 | $550 | $390 | $370 | $380 |
| Item | Quantity | R1Buds INC | R2Shook Company LLC | R3Mc Connell Contracting INC | R4Black Horse Bridge Construction INC | R5Bog Construction INC | R6Rietschlin Construction INC | R7Alan Stone CO INC | R8Eclipse CO LLC |
|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,500 | $1,500 | $1,500 | $4,800 | $2,700 | $9,000 | $1,500 | $24,974 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 41 FT | $40.00 | $5.00 | $10.00 | $20.00 | $25.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $380 |
| $515 |
| 10% |
| 526E15000 REINFORCED CONCRETE APPROACH SLABS (T=13") | 142 SY | $315 | $225 | $275 | $225 | $190 | $206 | $300 | $253 | 10% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 32 CY | $1,200 | $1,300 | $1,500 | $1,100 | $900 | $1,320 | $2,600 | $902 | 8% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 172 CY | $180 | $150 | $161 | $161 | $260 | $174 | $188 | $166 | 7% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 75 FT | $385 | $688 | $450 | $630 | $600 | $830 | $136 | $484 | 6% |
| 524E94803 DRILLED SHAFTS, 42" DIAMETER, ABOVE BEDROCK, AS PE | 57 FT | $385 | $474 | $450 | $580 | $600 | $330 | $404 | $515 | 5% |
| 304E20000 AGGREGATE BASE | 181 CY | $90.00 | $80.00 | $95.00 | $80.00 | $87.00 | $80.00 | $80.00 | $75.00 | 4% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 13,478 LB | $1.15 | $1.90 | $1.20 | $1.50 | $1.50 | $1.00 | $2.50 | $1.00 | 3% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $15,000 | $44,000 | $25,000 | $26,000 | $45,000 | $26,000 | $12,000 | $82,400 | 3% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 44 CY | $310 | $300 | $289 | $289 | $398 | $313 | $338 | $298 | 3% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (52 CY | $250 | $280 | $217 | $217 | $354 | $235 | $253 | $224 | 3% |
| 526E90010 TYPE A INSTALLATION | 64 FT | $200 | $150 | $150 | $140 | $100 | $129 | $240 | $124 | 3% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 90 FT | $135 | $150 | $152 | $160 | $140 | $146 | $151 | $165 | 3% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 27 CF | $425 | $350 | $450 | $360 | $325 | $507 | $548 | $376 | 2% |
| 203E20000 EMBANKMENT | 586 CY | $18.00 | $20.00 | $20.00 | $30.00 | $25.00 | $14.00 | $14.00 | $15.00 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10,000 | $43,000 | $20,000 | $20,000 | $40,000 | $25,000 | $27,819 | 2% |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 90 CY | $92.00 | $80.00 | $95.00 | $90.00 | $55.00 | $85.00 | $61.00 | $72.00 | 2% |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,000 | $2,000 | $2,300 | $2,120 | $2,300 | $2,160 | $2,500 | $2,138 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $7,500 | $5,000 | $8,500 | $10,000 | $5,500 | $2,000 | $1,500 | $7,500 | 2% |
| $28.00 |
| $19.00 |
| $23.00 |
| 202E38000 GUARDRAIL REMOVED | 315 FT | $2.00 | $2.00 | $1.50 | $1.80 | $3.00 | $3.50 | $3.00 | $1.50 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 3 EACH | $500 | $250 | $200 | $260 | $250 | $375 | $303 | $206 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 1 EACH | $250 | $200 | $150 | $105 | $500 | $330 | $123 | $206 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 4 EACH | $100 | $250 | $250 | $65.00 | $250 | $330 | $76.00 | $258 |
| 202E53100 MAILBOX REMOVED | 2 EACH | $50.00 | $50.00 | $50.00 | $10.00 | $100 | $170 | $11.50 | $71.50 |
| 203E10000 EXCAVATION | 333 CY | $15.00 | $25.00 | $20.00 | $36.00 | $20.00 | $26.00 | $16.00 | $22.00 |
| 204E10000 SUBGRADE COMPACTION | 1,132 SY | $3.00 | $2.50 | $1.50 | $2.50 | $3.00 | $3.00 | $1.50 | $3.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 262.5 FT | $16.80 | $17.00 | $19.00 | $17.20 | $20.00 | $19.00 | $20.00 | $16.50 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 3 EACH | $1,200 | $1,100 | $1,300 | $1,195 | $1,250 | $1,296 | $1,400 | $1,015 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $950 | $1,000 | $925 | $980 | $1,200 | $1,026 | $1,100 | $953 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 2 EACH | $175 | $100 | $150 | $150 | $200 | $135 | $175 | $195 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $15.00 | $5.00 | $50.00 | $100 | $50.00 | $54.00 | $103 | $155 |
| 659E00300 TOPSOIL | 126 CY | $15.00 | $16.00 | $45.00 | $44.00 | $32.00 | $36.00 | $37.00 | $68.00 |
| 659E10000 SEEDING AND MULCHING | 1,133 SY | $2.00 | $1.50 | $2.50 | $3.00 | $5.00 | $3.25 | $2.50 | $3.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 57 SY | $0.10 | $0.20 | $1.00 | $1.00 | $1.00 | $1.00 | $0.80 | $3.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.15 TON | $600 | $500 | $1,500 | $500 | $1,000 | $800 | $796 | $629 |
| 659E31000 LIME | 0.23 ACRE | $450 | $40.00 | $1,000 | $109 | $100 | $100 | $183 | $82.52 |
| 659E35000 WATER | 6 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $10.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 6,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.2 CY | $3,500 | $1,500 | $4,500 | $2,500 | $2,500 | $4,500 | $3,500 | $4,363 |
| 605E31100 AGGREGATE DRAINS | 100 FT | $18.00 | $10.00 | $12.00 | $20.00 | $15.00 | $15.00 | $9.00 | $16.50 |
| 611E04600 12" CONDUIT, TYPE C | 46 FT | $78.00 | $60.00 | $65.00 | $48.00 | $60.00 | $85.00 | $26.50 | $143 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $3,500 | $3,500 | $2,500 | $2,400 | $3,000 | $3,650 | $1,800 | $3,862 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 55 FT | $5.00 | $5.00 | $5.00 | $12.00 | $15.00 | $22.00 | $15.50 | $8.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (VARIABLE DEPTH | 372 SY | $15.00 | $7.00 | $14.00 | $14.00 | $12.00 | $15.25 | $16.50 | $14.50 |
| 407E10000 TACK COAT | 302 GAL | $2.00 | $5.00 | $2.35 | $2.35 | $4.00 | $2.75 | $2.50 | $2.50 |
| 621E00100 RPM | 9 EACH | $250 | $340 | $175 | $285 | $400 | $440 | $475 | $335 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 9 EACH | $5.00 | $10.00 | $40.00 | $5.00 | $50.00 | $25.00 | $31.50 | $12.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 10 EACH | $8.50 | $7.00 | $8.00 | $7.80 | $10.00 | $9.00 | $9.00 | $8.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 67 FT | $12.50 | $22.00 | $15.00 | $12.40 | $15.00 | $13.50 | $151 | $13.50 |
| 630E80100 SIGN, FLAT SHEET | 18.3 SF | $20.00 | $35.00 | $25.00 | $24.00 | $30.00 | $22.00 | $29.00 | $14.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 5 EACH | $10.00 | $5.00 | $50.00 | $10.00 | $50.00 | $22.00 | $14.00 | $10.50 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 5 EACH | $10.00 | $20.00 | $50.00 | $15.00 | $50.00 | $22.00 | $14.00 | $13.00 |
| 646E10010 EDGE LINE, 6" | 0.18 MILE | $30,360 | $20,000 | $18,000 | $17,510 | $20,000 | $19,000 | $20,000 | $17,600 |
| 646E10200 CENTER LINE | 0.09 MILE | $30,760 | $20,000 | $18,000 | $17,930 | $25,000 | $19,400 | $21,000 | $18,000 |
| 407E10000 TACK COAT | 55 GAL | $2.00 | $5.00 | $2.35 | $2.40 | $4.00 | $2.75 | $2.50 | $2.50 |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 25 CY | $290 | $250 | $110 | $462 | $290 | $500 | $539 | $476 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 24 HOUR | $65.00 | $50.00 | $10.00 | $60.00 | $70.00 | $70.00 | $76.00 | $67.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $5,000 | $10,000 | $5,000 | $3,700 | $6,500 | $7,250 | $7,800 | $2,910 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $65.00 | $100 | $85.00 | $110 | $120 | $324 | $188 | $226 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.09 MILE | $6,500 | $10,000 | $3,000 | $5,780 | $5,000 | $6,300 | $6,700 | $5,800 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.18 MILE | $5,800 | $5,000 | $2,500 | $5,680 | $5,000 | $6,200 | $6,600 | $5,700 |
| 616E10000 WATER | 10 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $10.00 | $0.10 | $32.00 |
| 617E10100 COMPACTED AGGREGATE | 30 CY | $130 | $70.00 | $25.00 | $100 | $87.00 | $87.00 | $91.00 | $115 |
| 202E23500 WEARING COURSE REMOVED | 100 SY | $20.00 | $6.00 | $10.00 | $8.00 | $15.00 | $12.00 | $8.00 | $10.50 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $4,500 | $10,000 | $10,000 | $4,500 | $3,500 | $10,000 | $15,000 | $515 |
| 503E21100 UNCLASSIFIED EXCAVATION | 222 CY | $25.00 | $40.00 | $20.00 | $100 | $32.00 | $90.00 | $15.50 | $103 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 63 SY | $25.00 | $30.00 | $15.00 | $23.00 | $35.00 | $27.00 | $45.00 | $20.50 |
| 512E33000 TYPE 2 WATERPROOFING | 9 SY | $20.00 | $30.00 | $30.00 | $100 | $60.00 | $41.00 | $195 | $26.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 25 SF | $35.00 | $15.00 | $15.00 | $1.00 | $20.00 | $16.00 | $8.50 | $7.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 84 FT | $38.00 | $30.00 | $28.00 | $36.00 | $35.00 | $25.50 | $24.00 | $51.50 |
| 516E41100 1/8" PREFORMED BEARING PAD | 16 EACH | $25.00 | $20.00 | $10.00 | $20.00 | $20.00 | $40.00 | $40.00 | $16.50 |
| 516E43101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 16 EACH | $95.00 | $150 | $100 | $100 | $100 | $150 | $75.00 | $77.50 |
| 516E44001 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 16 EACH | $385 | $450 | $450 | $450 | $365 | $420 | $75.00 | $263 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 55 CY | $125 | $90.00 | $65.00 | $100 | $88.00 | $72.00 | $120 | $77.50 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 100 FT | $15.00 | $10.00 | $6.00 | $8.00 | $10.00 | $9.00 | $5.00 | $16.50 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 60 FT | $18.00 | $10.00 | $6.00 | $12.00 | $10.00 | $20.00 | $4.50 | $16.50 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $10,936 | $8,500 | $7,800 | $14,000 | $6,500 | $4,400 | $16,000 |
| 619E16010 FIELD OFFICE, TYPE B | 4 MNTH | $150 | $1,500 | $1,100 | $800 | $500 | $1,674 | $700 | $900 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,200 | $10,000 | $1,200 | $6,000 | $3,500 | $5,200 | $11,000 | $13,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E12031 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 8 EACH | $12,000 | $96k | 16% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 100 CY | $450 | $45k | 8% |
| 526E15000 REINFORCED CONCRETE APPROACH SLABS (T=13") | 142 SY | $315 | $45k | 8% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 32 CY | $1,200 | $38k | 7% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 172 CY | $180 | $31k | 5% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 75 FT | $385 | $29k | 5% |
| 524E94803 DRILLED SHAFTS, 42" DIAMETER, ABOVE BEDROCK, AS PE | 57 FT | $385 | $22k | 4% |
| 304E20000 AGGREGATE BASE | 181 CY | $90 | $16k | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 13,478 LB | $1.15 | $15k | 3% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $15,000 | $15k | 3% |