MOE-CR 12-18.00
MOE County · est $0.3M
Bid dateThursday, July 29—
MOE County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 30 more items below.
| Item | Quantity | R1Black Horse Bridge Construction INC | R2Buds INC | R3Complete General Construction Company | R4Eclipse CO LLC | R5Shelly & Sands INC | R6Alan Stone CO INC | R7Ohio-west Virginia Excavating CO | R8Dot Construction CORP | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 611E71000 CONDUIT, TYPE A, PRECAST REINFORCED CONCRETE ARCH | 34 FT | $2,980 | $3,885 | $3,000 | $3,830 | $3,225 | $3,500 | $2,700 | $4,000 | 34% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $28,000 | $5,000 | $8,000 | $7,040 | $15,000 |
| Item | Quantity | R1Black Horse Bridge Construction INC | R2Buds INC | R3Complete General Construction Company | R4Eclipse CO LLC | R5Shelly & Sands INC | R6Alan Stone CO INC | R7Ohio-west Virginia Excavating CO | R8Dot Construction CORP |
|---|---|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 189 SY | $8.00 | $12.50 | $13.00 | $6.00 | $9.00 | $8.50 | $22.00 | $20.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 13 FT | $18.00 | $25.00 | $50.00 | $29.00 | $14.00 | $31.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $21,000 |
| $50,000 |
| $20,000 |
| 9% |
| 511E46210 CLASS QC1 CONCRETE, RETAINING/WINGWALL INCLUDING F | 44 CY | $630 | $1,100 | $800 | $382 | $1,450 | $1,600 | $1,200 | $1,000 | 9% |
| 503E21100 UNCLASSIFIED EXCAVATION | 228 CY | $91.00 | $24.00 | $40.00 | $21.00 | $38.00 | $24.00 | $100 | $50.00 | 7% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 5,382 LB | $3.00 | $1.75 | $2.50 | $1.00 | $2.50 | $2.50 | $2.75 | $5.00 | 5% |
| 503E31100 ROCK EXCAVATION | 143 CY | $95.00 | $50.00 | $55.00 | $61.00 | $120 | $46.00 | $75.00 | $50.00 | 5% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $12,400 | $12,000 | $26,000 | $6,953 | $23,000 | $13,000 | $14,000 | $50,000 | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 17 CY | $618 | $618 | $650 | $620 | $650 | $818 | $275 | $650 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $7,500 | $10,000 | $32,892 | $10,000 | $12,000 | $10,000 | $20,430 | 3% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 17 CY | $475 | $650 | $700 | $928 | $1,475 | $1,200 | $1,400 | $1,000 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $7,000 | $3,000 | $5,000 | $10,500 | $7,750 | $6,000 | $2,000 | $10,000 | 2% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 24 CY | $268 | $268 | $480 | $270 | $480 | $355 | $250 | $480 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $6,000 | $4,000 | $4,800 | $7,683 | $4,735 | $6,400 | $5,500 | $4,735 | 2% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 60 CY | $100 | $100 | $100 | $90.00 | $135 | $247 | $130 | $100 | 2% |
| 606E15051 GUARDRAIL, TYPE MGS, AS PER PLAN | 143.75 FT | $37.20 | $105 | $95.00 | $129 | $37.20 | $59.50 | $135 | $37.20 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,000 | $4,000 | $4,000 | $5,700 | $3,500 | $5,900 | $5,700 | $10,000 | 2% |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $4,200 | $2,000 | $12,000 | $6,000 | $8,000 | $6,500 | $9,000 | $5,000 | 1% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 143.75 FT | $28.80 | $28.50 | $28.00 | $32.00 | $28.80 | $40.00 | $32.00 | $28.80 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,900 | $3,500 | $4,000 | $5,519 | $2,200 | $2,500 | $6,500 | $5,000 | 1% |
| 304E20000 AGGREGATE BASE | 38 CY | $100 | $120 | $125 | $100 | $112 | $117 | $135 | $100 | 1% |
| $25.00 |
| $50.00 |
| 202E38100 GUARDRAIL REMOVED FOR STORAGE | 55.5 FT | $3.00 | $5.00 | $10.00 | $3.00 | $3.00 | $10.00 | $10.00 | $3.00 |
| 202E75200 FENCE REMOVED FOR REUSE | 40 FT | $11.00 | $15.00 | $5.00 | $44.00 | $58.50 | $14.00 | $15.00 | $58.50 |
| 203E10000 EXCAVATION | 60 CY | $32.00 | $30.00 | $24.00 | $21.00 | $24.25 | $20.50 | $25.00 | $50.00 |
| 203E20000 EMBANKMENT | 20 CY | $26.00 | $60.00 | $32.00 | $29.00 | $13.00 | $15.00 | $40.00 | $100 |
| 204E10000 SUBGRADE COMPACTION | 237 SY | $3.00 | $3.00 | $3.50 | $3.00 | $6.00 | $3.00 | $8.92 | $4.00 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 1 EACH | $2,120 | $1,950 | $2,725 | $2,342 | $2,120 | $2,600 | $3,000 | $2,120 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, NCHRP 350 | 1 EACH | $2,780 | $2,450 | $3,650 | $3,099 | $2,780 | $3,200 | $4,000 | $2,780 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $1,140 | $1,100 | $1,650 | $1,280 | $1,140 | $1,500 | $1,800 | $1,140 |
| 601E34201 ROCK CHANNEL PROTECTION, TYPE C WITHOUT FILTER, AS | 32 CY | $65.00 | $118 | $88.00 | $47.00 | $137 | $59.50 | $95.00 | $100 |
| 659E10000 SEEDING AND MULCHING | 129 SY | $5.00 | $8.00 | $12.00 | $22.00 | $12.25 | $18.50 | $15.28 | $19.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.02 TON | $500 | $500 | $583 | $665 | $582 | $2,000 | $700 | $985 |
| 659E31000 LIME | 0.03 ACRE | $200 | $120 | $137 | $87.00 | $137 | $932 | $175 | $140 |
| 659E35000 WATER | 0.3 MGAL | $10.00 | $1.00 | $1.00 | $1.00 | $1.00 | $132 | $1.00 | $2.00 |
| 832E30000 EROSION CONTROL | 321 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.68 CY | $2,029 | $1,500 | $950 | $2,346 | $2,800 | $2,400 | $1,200 | $10,000 |
| 605E31100 AGGREGATE DRAINS | 31.6 FT | $19.00 | $25.00 | $22.00 | $10.00 | $18.00 | $49.50 | $25.00 | $40.00 |
| 611E04900 12" CONDUIT, TYPE D | 50 FT | $48.00 | $75.00 | $110 | $53.00 | $62.00 | $77.50 | $80.00 | $50.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 32.5 FT | $4.00 | $3.00 | $12.00 | $30.00 | $10.00 | $58.00 | $10.00 | $10.00 |
| 407E10000 TACK COAT | 21 GAL | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 | $5.50 | $10.00 | $4.00 |
| 617E10100 COMPACTED AGGREGATE | 3 CY | $270 | $180 | $225 | $141 | $225 | $291 | $80.00 | $200 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 6 EACH | $8.50 | $8.00 | $9.00 | $9.00 | $8.50 | $13.00 | $12.00 | $8.50 |
| 630E85000 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE | 4 EACH | $25.00 | $10.00 | $50.00 | $27.00 | $25.00 | $124 | $30.00 | $25.00 |
| 630E86006 REMOVAL OF GROUND MOUNTED POST SUPPORT AND STORAGE | 4 EACH | $30.00 | $10.00 | $50.00 | $33.00 | $30.00 | $62.00 | $50.00 | $30.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 85 SY | $30.00 | $23.00 | $28.50 | $33.00 | $47.50 | $26.00 | $55.00 | $47.50 |
| 512E33000 TYPE 2 WATERPROOFING | 169 SY | $20.00 | $20.00 | $23.50 | $16.00 | $35.00 | $16.50 | $25.00 | $40.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 54 SF | $6.00 | $12.00 | $10.00 | $7.00 | $1.50 | $2.00 | $7.00 | $10.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 66 FT | $11.00 | $18.00 | $14.00 | $16.00 | $4.00 | $8.50 | $6.00 | $20.00 |
| 690E98400 SPECIAL - MISC: WORK INVOLVING ASBESTOS CONTAINING | 1 LS | $500 | $100 | $800 | $871 | $1,600 | $26.50 | $1,000 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E71000 CONDUIT, TYPE A, PRECAST REINFORCED CONCRETE ARCH | 34 FT | $2,980 | $101k | 31% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $28,000 | $28k | 9% |
| 511E46210 CLASS QC1 CONCRETE, RETAINING/WINGWALL INCLUDING F | 44 CY | $630 | $28k | 8% |
| 503E21100 UNCLASSIFIED EXCAVATION | 228 CY | $91 | $21k | 6% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 5,382 LB | $3 | $16k | 5% |
| 503E31100 ROCK EXCAVATION | 143 CY | $95 | $14k | 4% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $12,400 | $12k | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 17 CY | $618 | $11k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 3% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 17 CY | $475 | $8k | 2% |